Crews rotate around the heat, not the clock — a cold charge costs more than a long shift.
Each weld and seam is stamped to the hand that set it; the plate is signed before it ships.
Soot on the gauges we expect; a skipped pressure check stops the whole pour cold.
We build to the half-century mark — the winding gear must turn long after we clock out.