Control Floor
Night Shift · No. 2 Hall
Search line, batch or crew
MK
Cast Tonnage · Shift
1,842 t
+6.3%
vs. last shift
Furnace Uptime
94.1%
+1.8%
7-day mean
Scrap Rate
3.7%
+0.9%
above target
Open Faults
07
-2
cleared today
| Batch | Line | Grade | Tapped (t) | Temp °C | Status | — |
|---|---|---|---|---|---|---|
| KW-4471 | Tower A | Structural S355 | 312.6 | 1,538 | Pouring | |
| KW-4470 | Tower B | Rail R260 | 198.0 | 1,492 | Pouring | |
| KW-4468 | Furnace 3 | Plate P265 | 441.2 | 1,604 | Fault · Tap | |
| KW-4465 | Caster 1 | Coil C60 | 87.4 | 1,447 | On Hold | |
| KW-4463 | Tower A | Structural S275 | 256.9 | 1,521 | Pouring | |
| KW-4459 | Furnace 1 | Wire W4 | 63.1 | 1,388 | On Hold | |
| KW-4452 | Caster 2 | Plate P355 | 503.8 | 1,576 | Pouring |