02 · Structural Method · Slide 03
03 / 12
Concreto aparente · delivery frame

What Holds

01

Form before finish

The first review checks span, load, and access before any surface decision is made.

02

Empty space works

Every release leaves one clear bay for teams to add equipment without negotiation.

03

Steel states the joint

Edges, rails, and crossings stay visible so maintenance can read the system at a glance.

04

Weather records use

Wear is measured quarterly and kept in the plan instead of hidden by cosmetic resets.

This is the Brazilian Paulista Concrete design system, applied by Curio Design — a design-style library for AI agents. Full Brazilian Paulista Concrete guide → designbycurio.com/learn/paulo-mendes-da-rocha-concrete-1995