Stage Readiness Board

Mission interval T-018 days / drawing control active

MK
Certified mass

6.47M

+1.8% LB verified
Open tolerances

142

+9 24 hr delta
Supplier lots

318

+12 Accepted
Redline exposure

0.7%

-0.3% Sheet area
Critical Assembly Ledger Orthographic release status by vehicle station
SHEET VX-2047-A
Assembly Station Mass LB Tolerance Owner Status Act
S-IC thrust frame STA 101.4 138,420 +0.018 Assembly Bay 2 Nominal
LOX feed manifold STA 248.9 24,880 -0.006 Propulsion Cell In review
Interstage ring A STA 526.0 31,104 +0.011 Structures Desk Released
S-II bulkhead weld STA 684.7 18,736 +0.027 Field QA Redline
Instrument unit rack STA 2800.1 4,612 -0.002 Guidance Lab Nominal
Forward skirt panel STA 2358.6 9,084 +0.004 Frame Review Hold
Engine fairing set STA 58.2 12,940 +0.009 F-1 Interface Accepted