Operations Day 1071 — Cycle Nominal
SB
He-3 Yield 428.6 kg +8.2%
Active Harvesters 3 / 4 −1 unit
O₂ Reserve 94.1% +1.4%
Comms Uptime 99.97% Stable
Harvester Telemetry Far-side grid — last sweep 04:12 LST
Unit Sector Load Core Temp Status
MTX-01 Mare Crisium N 87.4 t 41.2 °C Online •••
MTX-02 Mare Crisium S 79.0 t 39.8 °C Online •••
MTX-03 Highland Rim E 62.3 t 58.6 °C Throttled •••
MTX-04 Highland Rim W 0.0 t — — Halted •••
RKT-A1 Canister Bay 12.8 t 22.0 °C Loading •••
SCN-07 Perimeter Relay 18.4 °C Standby •••
This is the Moon (2009) design system, applied by Curio Design — a design-style library for AI agents. Full Moon (2009) guide → designbycurio.com/learn/moon-2009-sarang