CHAPTER 03 · SECTION C: OPERATING PLAN · SLIDE 04
04 / 12

GRID A-10 · SCALE 1:1 · FIELD NOTES LOCKED

MEASURE BEFORE MOTION

THE GRID MAKES SPEED VISIBLE

EVERY DECISION LANDS ON A TEN-UNIT MODULE; REVISIONS STAY LOCAL.

GRID
A-10

CONSTRAINTS REMOVE GUESSWORK

SET WIDTHS, DATUMS, AND CLEARANCES ARE RECORDED BEFORE BUILD STARTS.

SECTION
B-04

CRITICAL CHANGES GET A MARK

VERMILLION FLAGS ONLY THE DIMENSIONS THAT CAN MOVE THE SCHEDULE.

REV
C-02

HANDOFFS READ LIKE SECTIONS

ENGINEERING, PRODUCT, AND OPERATIONS SHARE ONE ANNOTATED DRAWING.

PLATE
04