1
Start with the frame, finish over time
Roof, kitchen, and bathroom ship first as a weathertight core. Walls and rooms follow when families can afford them.
2
Design for the hard sites
Sloped terrain, tight density limits, urgent timelines. The half-house turns constraints into a construction sequence.
3
Open the drawings
Plans, sections, and axonometrics are freely licensed. Fork, adapt, and build without asking permission.
4
Measure in decades, not quarters
A concrete frame outlasts its first owner. Modules completed in 2005 are still standing with zero structural issues.