Ridgeline Field archive / 1953
Expedition systems Plate 07 / 12
Ridgeline / route-load ledger / final ascent

The summit is a relay, not a single push.

Recorded carrying weight falls by 98% between the first cache and the last high camp.

Load transfer by camp

Net carried forward / kg
This is the Everest Expedition (1953) design system, applied by Curio — a design-style library for AI agents. Full Everest Expedition (1953) guide → designbycurio.com/learn/everest-expedition-1953