WORKS REGISTER / 01
Overview
/
EA
STRUCTURAL INDEX
At a glance
LAST CALIBRATION · 14 MAY
RECORDED SPANS
+8.6%
184
IRON MEMBERS
+12.4%
18,420
RIVETS LOGGED
+4.1%
2.51M
INSPECTION RATE
−1.8%
96.4%
Assembly register
Measured sections awaiting their next mark.
6 RECORDS / PLATE 04
Assembly
Span
Members
Load
Status
Mark
North leg brace
SECTION N—04
124 m
2,910
188 t
Measured
West arch tie
SECTION W—11
96 m
1,744
142 t
In review
Second-level girder
SECTION S—02
78 m
1,208
121 t
Filed
East pier joint
SECTION E—08
112 m
2,336
176 t
Measured
South cross member
SECTION S—14
88 m
1,496
135 t
In review
Upper platform rail
SECTION U—03
64 m
986
84 t
Filed
This is the
Eiffel Tower (1889)
design system, applied by
Curio
— a design-style library for AI agents. Full Eiffel Tower (1889) guide →
designbycurio.com/learn/eiffel-tower-1889